A break in the connection between the operations center and the process plant is undesirable but not critical. This is due to the fact that all control logic resides and operates locally on PLCs or PCs. Once a command is received, the local system will carry out the task even if the connection is lost (within defined restrictions). The main consequence is that the operations center loses visibility into the process during the disruption.